US Bridges

PI0818 Dueber over Bear Run

Good

Stark County, Ohio · 0.3 Mi. S. of TR297 · Structure no. 7634374

Built
1994
31 years old
Condition
Good
inspected October 2024
Type
Frame
Concrete
Length
31 ft
1 main span
Daily traffic
1,363
2015 count
Owner
County
County Highway Agency

About this bridge

PI0818 Dueber over Bear Run is a concrete frame carrying PI0818 Dueber over Bear Run in Stark County, Ohio. It was built in 1994, so it is 31 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,363 vehicles a day, roughly 26% of them trucks, projected to reach 1,892 by 2035. The structure is 31 ft (9.4 m) long and 30 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesPI0818 Dueber
CrossesBear Run
Location0.3 Mi. S. of TR297
RouteCounty Highway C0254
StateOhio
Coordinates40.70932, -81.40167
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating71.4 US tons
Inventory rating42.9 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length31 ft (9.4 m)
Longest span31 ft (9.4 m)
Deck width30 ft (9.2 m)
Roadway width30 ft (9.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,363 (2015)
Projected traffic1,892 by 2035
Trucks26%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was PI0818 Dueber over Bear Run built?

It was built in 1994, making it 31 years old in 2025.

What condition is PI0818 Dueber over Bear Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does PI0818 Dueber over Bear Run carry?

About 1,363 vehicles per day (2015 count), of which roughly 26% are trucks.

How long is PI0818 Dueber over Bear Run?

The structure is 31 ft (9.4 m) long with a longest span of 31 ft (9.4 m) and a deck 30 ft wide.

Who owns PI0818 Dueber over Bear Run?

It is owned by the County Highway Agency.