PL0407 Applegrove over West Branch Nimishillen
GoodStark County, Ohio · 0.3 Mi. W. of TR50A · Structure no. 7634145
- Built
- 1941
- 84 years old, rebuilt 2011
- Condition
- Good
- inspected November 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 47 ft
- 1 main span
- Daily traffic
- 12,318
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
PL0407 Applegrove over West Branch Nimishillen is a prestressed concrete box beam or girders - multiple carrying PL0407 Applegrove over West Branch Nimishillen in Stark County, Ohio. It was built in 1941 and reconstructed in 2011, so it is 84 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 12,318 vehicles a day, roughly 6% of them trucks, projected to reach 17,097 by 2035. The structure is 47 ft (14.3 m) long and 52 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was PL0407 Applegrove over West Branch Nimishillen built?
It was built in 1941, making it 84 years old in 2025. It was reconstructed in 2011.
What condition is PL0407 Applegrove over West Branch Nimishillen in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does PL0407 Applegrove over West Branch Nimishillen carry?
About 12,318 vehicles per day (2015 count), of which roughly 6% are trucks.
How long is PL0407 Applegrove over West Branch Nimishillen?
The structure is 47 ft (14.3 m) long with a longest span of 42 ft (12.8 m) and a deck 52 ft wide.
Who owns PL0407 Applegrove over West Branch Nimishillen?
It is owned by the County Highway Agency.