PE0721 Cherry over Chessie and Con Rail Rrs
FairStark County, Ohio · 0.4 Mi. W. of 1st St. · Structure no. 7632037
- Built
- 1952
- 73 years old, rebuilt 1981
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 267 ft
- 4 main spans
- Daily traffic
- 6,100
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
PE0721 Cherry over Chessie and Con Rail Rrs is a steel continuous stringer/multi-beam or girder carrying PE0721 Cherry over Chessie and Con Rail Rrs in Stark County, Ohio. It was built in 1952 and reconstructed in 1981, so it is 73 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,100 vehicles a day, roughly 8% of them trucks, projected to reach 6,700 by 2044. The structure is 267 ft (81.4 m) long and 49 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was PE0721 Cherry over Chessie and Con Rail Rrs built?
It was built in 1952, making it 73 years old in 2025. It was reconstructed in 1981.
What condition is PE0721 Cherry over Chessie and Con Rail Rrs in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does PE0721 Cherry over Chessie and Con Rail Rrs carry?
About 6,100 vehicles per day (2024 count), of which roughly 8% are trucks.
How long is PE0721 Cherry over Chessie and Con Rail Rrs?
The structure is 267 ft (81.4 m) long with a longest span of 68 ft (20.7 m) and a deck 49 ft wide.
Who owns PE0721 Cherry over Chessie and Con Rail Rrs?
It is owned by the County Highway Agency.