US Bridges

Usr 30 over Over Genoa Ave TR 243

Good

Stark County, Ohio · 2.34 MI E of Usr 60 · Structure no. 7607490

Built
1973
52 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
141 ft
3 main spans
Daily traffic
16,738
2015 count
Owner
State
State Highway Agency

About this bridge

Usr 30 over Over Genoa Ave TR 243 is a steel continuous stringer/multi-beam or girder carrying Usr 30 over Over Genoa Ave TR 243 in Stark County, Ohio. It was built in 1973, so it is 52 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,738 vehicles a day, roughly 15% of them trucks, projected to reach 23,232 by 2035. The structure is 141 ft (43 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUsr 30
CrossesOver Genoa Ave TR 243
Location2.34 MI E of Usr 60
RouteU.S. Route 30
StateOhio
Coordinates40.76712, -81.46709
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.2 US tons
Inventory rating37.8 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length141 ft (43 m)
Longest span56 ft (17.1 m)
Deck width42 ft (12.8 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,738 (2015)
Projected traffic23,232 by 2035
Trucks15%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Usr 30 over Over Genoa Ave TR 243 built?

It was built in 1973, making it 52 years old in 2025.

What condition is Usr 30 over Over Genoa Ave TR 243 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Usr 30 over Over Genoa Ave TR 243 carry?

About 16,738 vehicles per day (2015 count), of which roughly 15% are trucks.

How long is Usr 30 over Over Genoa Ave TR 243?

The structure is 141 ft (43 m) long with a longest span of 56 ft (17.1 m) and a deck 42 ft wide.

Who owns Usr 30 over Over Genoa Ave TR 243?

It is owned by the State Highway Agency.