US Bridges

I.R. 77 over Over Fulton RD SR-687

Good

Stark County, Ohio · JCT of Ir 77 and SR 687 · Structure no. 7604092

Built
2003
22 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
110 ft
1 main span
Daily traffic
93,200
2015 count
Owner
State
State Highway Agency

About this bridge

I.R. 77 over Over Fulton RD SR-687 is a steel stringer/multi-beam or girder carrying I.R. 77 over Over Fulton RD SR-687 in Stark County, Ohio. It was built in 2003, so it is 22 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 93,200 vehicles a day, roughly 7% of them trucks, projected to reach 129,362 by 2035. The structure is 110 ft (33.5 m) long and 147 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI.R. 77
CrossesOver Fulton RD SR-687
LocationJCT of Ir 77 and SR 687
RouteInterstate 77
StateOhio
Coordinates40.8242, -81.39638
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating42.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length110 ft (33.5 m)
Longest span108 ft (32.8 m)
Deck width147 ft (44.9 m)
Roadway width144 ft (44 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic93,200 (2015)
Projected traffic129,362 by 2035
Trucks7%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I.R. 77 over Over Fulton RD SR-687 built?

It was built in 2003, making it 22 years old in 2025.

What condition is I.R. 77 over Over Fulton RD SR-687 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does I.R. 77 over Over Fulton RD SR-687 carry?

About 93,200 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is I.R. 77 over Over Fulton RD SR-687?

The structure is 110 ft (33.5 m) long with a longest span of 108 ft (32.8 m) and a deck 147 ft wide.

Who owns I.R. 77 over Over Fulton RD SR-687?

It is owned by the State Highway Agency.