Miami Shelby East over Spring Creek Ditch
GoodShelby County, Ohio · .305 M. E. Knoop Johnston · Structure no. 7532601
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected July 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 41 ft
- 1 main span
- Daily traffic
- 274
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Miami Shelby East over Spring Creek Ditch is a prestressed concrete box beam or girders - multiple carrying Miami Shelby East over Spring Creek Ditch in Shelby County, Ohio. It was built in 2002, so it is 23 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 274 vehicles a day, roughly 7% of them trucks, projected to reach 325 by 2040. The structure is 41 ft (12.5 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Miami Shelby East over Spring Creek Ditch built?
It was built in 2002, making it 23 years old in 2025.
What condition is Miami Shelby East over Spring Creek Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does Miami Shelby East over Spring Creek Ditch carry?
About 274 vehicles per day (2020 count), of which roughly 7% are trucks.
How long is Miami Shelby East over Spring Creek Ditch?
The structure is 41 ft (12.5 m) long with a longest span of 37 ft (11.3 m) and a deck 28 ft wide.
Who owns Miami Shelby East over Spring Creek Ditch?
It is owned by the County Highway Agency.