US Bridges

SR 823 over Over Fairground Road

Good

Scioto County, Ohio · 0.25 Miles from US 23 · Structure no. 7306555

Built
2018
7 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
81 ft
1 main span
Daily traffic
3,900
2020 count
Owner
State
State Highway Agency

About this bridge

SR 823 over Over Fairground Road is a prestressed concrete stringer/multi-beam or girder carrying SR 823 over Over Fairground Road in Scioto County, Ohio. It was built in 2018, so it is 7 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,900 vehicles a day, roughly 12% of them trucks, projected to reach 5,413 by 2040. The structure is 81 ft (24.8 m) long and 62 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 823
CrossesOver Fairground Road
Location0.25 Miles from US 23
RouteState Highway 823
StateOhio
Coordinates38.89211, -82.99786
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.6 US tons
Inventory rating42.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length81 ft (24.8 m)
Longest span77 ft (23.6 m)
Deck width62 ft (19 m)
Roadway width59 ft (18 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,900 (2020)
Projected traffic5,413 by 2040
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 823 over Over Fairground Road built?

It was built in 2018, making it 7 years old in 2025.

What condition is SR 823 over Over Fairground Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does SR 823 over Over Fairground Road carry?

About 3,900 vehicles per day (2020 count), of which roughly 12% are trucks.

How long is SR 823 over Over Fairground Road?

The structure is 81 ft (24.8 m) long with a longest span of 77 ft (23.6 m) and a deck 62 ft wide.

Who owns SR 823 over Over Fairground Road?

It is owned by the State Highway Agency and maintained by the Private (other than railroad).