US Bridges

S.R. 823 over CR-29

Good

Scioto County, Ohio · 1.78 MI West of SR-139 · Structure no. 7306466

Built
2018
7 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
114 ft
1 main span
Daily traffic
9,200
2022 count
Owner
State
State Highway Agency

About this bridge

S.R. 823 over CR-29 is a prestressed concrete stringer/multi-beam or girder carrying S.R. 823 over CR-29 in Scioto County, Ohio. It was built in 2018, so it is 7 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,200 vehicles a day, roughly 12% of them trucks, projected to reach 12,770 by 2040. The structure is 114 ft (34.7 m) long and 89 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesS.R. 823
CrossesCR-29
Location1.78 MI West of SR-139
RouteState Highway 823
StateOhio
Coordinates38.86822, -82.90843
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.3 US tons
Inventory rating50 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length114 ft (34.7 m)
Longest span110 ft (33.5 m)
Deck width89 ft (27 m)
Roadway width85 ft (26 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,200 (2022)
Projected traffic12,770 by 2040
Trucks12%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S.R. 823 over CR-29 built?

It was built in 2018, making it 7 years old in 2025.

What condition is S.R. 823 over CR-29 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does S.R. 823 over CR-29 carry?

About 9,200 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is S.R. 823 over CR-29?

The structure is 114 ft (34.7 m) long with a longest span of 110 ft (33.5 m) and a deck 89 ft wide.

Who owns S.R. 823 over CR-29?

It is owned by the State Highway Agency and maintained by the Private (other than railroad).