US Bridges

Tong Hollow RD over Tributary to Paint Creek

Good

Ross County, Ohio · 2.51 Mi. E of SR-41 · Structure no. 7132107

Built
2012
13 years old
Condition
Good
inspected March 2024
Type
Frame
Concrete
Length
24 ft
2 main spans
Daily traffic
436
2018 count
Owner
County
County Highway Agency

About this bridge

Tong Hollow RD over Tributary to Paint Creek is a concrete frame carrying Tong Hollow RD over Tributary to Paint Creek in Ross County, Ohio. It was built in 2012, so it is 13 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 436 vehicles a day, roughly 8% of them trucks, projected to reach 605 by 2038. The structure is 24 ft (7.3 m) long and 30 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesTong Hollow RD
CrossesTributary to Paint Creek
Location2.51 Mi. E of SR-41
RouteCounty Highway T0041
StateOhio
Coordinates39.25539, -83.2562
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckOther
Main spans2
Design loadHL 93
Structure length24 ft (7.3 m)
Longest span10 ft (3 m)
Deck width30 ft (9.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic436 (2018)
Projected traffic605 by 2038
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Tong Hollow RD over Tributary to Paint Creek built?

It was built in 2012, making it 13 years old in 2025.

What condition is Tong Hollow RD over Tributary to Paint Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Tong Hollow RD over Tributary to Paint Creek carry?

About 436 vehicles per day (2018 count), of which roughly 8% are trucks.

How long is Tong Hollow RD over Tributary to Paint Creek?

The structure is 24 ft (7.3 m) long with a longest span of 10 ft (3 m) and a deck 30 ft wide.

Who owns Tong Hollow RD over Tributary to Paint Creek?

It is owned by the County Highway Agency.