Whitney Avenue over Consolidated Rail Corp
FairRichland County, Ohio · 0.2 MI W of JCT SR61 · Structure no. 7063806
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 163 ft
- 3 main spans
- Daily traffic
- 1,532
- 2015 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Whitney Avenue over Consolidated Rail Corp is a prestressed concrete continuous box beam or girders - multiple carrying Whitney Avenue over Consolidated Rail Corp in Richland County, Ohio. It was built in 1981, so it is 44 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,532 vehicles a day, roughly 5% of them trucks, projected to reach 2,126 by 2035. The structure is 163 ft (49.7 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Whitney Avenue over Consolidated Rail Corp built?
It was built in 1981, making it 44 years old in 2025.
What condition is Whitney Avenue over Consolidated Rail Corp in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Whitney Avenue over Consolidated Rail Corp carry?
About 1,532 vehicles per day (2015 count), of which roughly 5% are trucks.
How long is Whitney Avenue over Consolidated Rail Corp?
The structure is 163 ft (49.7 m) long with a longest span of 63 ft (19.2 m) and a deck 36 ft wide.
Who owns Whitney Avenue over Consolidated Rail Corp?
It is owned by the City or Municipal Highway Agency.