Hill RD over East Fork Slater Run
FairPosted for loadRichland County, Ohio · 0.1 West of Wheatcraft RD · Structure no. 7030258
- Built
- 1900
- 125 years old, rebuilt 1981
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 25 ft
- 1 main span
- Daily traffic
- 324
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Hill RD over East Fork Slater Run is a steel stringer/multi-beam or girder carrying Hill RD over East Fork Slater Run in Richland County, Ohio. It was built in 1900 and reconstructed in 1981, so it is 125 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 324 vehicles a day, roughly 7% of them trucks, projected to reach 450 by 2035. The structure is 25 ft (7.6 m) long and 20 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hill RD over East Fork Slater Run built?
It was built in 1900, making it 125 years old in 2025. It was reconstructed in 1981.
What condition is Hill RD over East Fork Slater Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Hill RD over East Fork Slater Run carry?
About 324 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is Hill RD over East Fork Slater Run?
The structure is 25 ft (7.6 m) long with a longest span of 22 ft (6.7 m) and a deck 20 ft wide.
Who owns Hill RD over East Fork Slater Run?
It is owned by the County Highway Agency.