C-27 Darlington E over Over RIC-071 -0193
GoodRichland County, Ohio · 1.93 MI N of Morrow CO · Structure no. 7003390
- Built
- 1959
- 66 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 305 ft
- 4 main spans
- Daily traffic
- 477
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
C-27 Darlington E over Over RIC-071 -0193 is a steel continuous stringer/multi-beam or girder carrying C-27 Darlington E over Over RIC-071 -0193 in Richland County, Ohio. It was built in 1959, so it is 66 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 477 vehicles a day, roughly 8% of them trucks, projected to reach 67,322 by 2035. The structure is 305 ft (93 m) long and 31 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was C-27 Darlington E over Over RIC-071 -0193 built?
It was built in 1959, making it 66 years old in 2025.
What condition is C-27 Darlington E over Over RIC-071 -0193 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does C-27 Darlington E over Over RIC-071 -0193 carry?
About 477 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is C-27 Darlington E over Over RIC-071 -0193?
The structure is 305 ft (93 m) long with a longest span of 91 ft (27.7 m) and a deck 31 ft wide.
Who owns C-27 Darlington E over Over RIC-071 -0193?
It is owned by the State Highway Agency.