Usr 30 over Over Ashland Railway
GoodRichland County, Ohio · 0.36 Miles East of SR13 · Structure no. 7001232
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 214 ft
- 3 main spans
- Daily traffic
- 28,500
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Usr 30 over Over Ashland Railway is a steel continuous stringer/multi-beam or girder carrying Usr 30 over Over Ashland Railway in Richland County, Ohio. It was built in 2021, so it is 4 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 28,500 vehicles a day, roughly 19% of them trucks, projected to reach 30,000 by 2041. The structure is 214 ft (65.3 m) long and 120 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Usr 30 over Over Ashland Railway built?
It was built in 2021, making it 4 years old in 2025.
What condition is Usr 30 over Over Ashland Railway in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does Usr 30 over Over Ashland Railway carry?
About 28,500 vehicles per day (2021 count), of which roughly 19% are trucks.
How long is Usr 30 over Over Ashland Railway?
The structure is 214 ft (65.3 m) long with a longest span of 88 ft (26.8 m) and a deck 120 ft wide.
Who owns Usr 30 over Over Ashland Railway?
It is owned by the State Highway Agency.