US Bridges

SR 13 over Toubys Run

Good

Richland County, Ohio · .74 Miles South of US 30 · Structure no. 7000561

Built
1991
34 years old
Condition
Good
inspected June 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
54 ft
1 main span
Daily traffic
4,693
2018 count
Owner
State
State Highway Agency

About this bridge

SR 13 over Toubys Run is a prestressed concrete box beam or girders - multiple carrying SR 13 over Toubys Run in Richland County, Ohio. It was built in 1991, so it is 34 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,693 vehicles a day, roughly 8% of them trucks, projected to reach 6,514 by 2038. The structure is 54 ft (16.5 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 13
CrossesToubys Run
Location.74 Miles South of US 30
RouteState Highway 13
StateOhio
Coordinates40.76786, -82.51449
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.4 US tons
Inventory rating27.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length54 ft (16.5 m)
Longest span50 ft (15.2 m)
Deck width39 ft (11.8 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,693 (2018)
Projected traffic6,514 by 2038
Trucks8%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 13 over Toubys Run built?

It was built in 1991, making it 34 years old in 2025.

What condition is SR 13 over Toubys Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does SR 13 over Toubys Run carry?

About 4,693 vehicles per day (2018 count), of which roughly 8% are trucks.

How long is SR 13 over Toubys Run?

The structure is 54 ft (16.5 m) long with a longest span of 50 ft (15.2 m) and a deck 39 ft wide.

Who owns SR 13 over Toubys Run?

It is owned by the State Highway Agency.