County Road B over North Powell Creek
FairPutnam County, Ohio · 0.33 MI E of RD 20 · Structure no. 6930336
- Built
- 1965
- 60 years old, rebuilt 2023
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 39 ft
- 1 main span
- Daily traffic
- 283
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
County Road B over North Powell Creek is a steel stringer/multi-beam or girder carrying County Road B over North Powell Creek in Putnam County, Ohio. It was built in 1965 and reconstructed in 2023, so it is 60 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 283 vehicles a day, roughly 8% of them trucks, projected to reach 400 by 2043. The structure is 39 ft (11.9 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road B over North Powell Creek built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 2023.
What condition is County Road B over North Powell Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does County Road B over North Powell Creek carry?
About 283 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is County Road B over North Powell Creek?
The structure is 39 ft (11.9 m) long with a longest span of 36 ft (11 m) and a deck 24 ft wide.
Who owns County Road B over North Powell Creek?
It is owned by the County Highway Agency.