Israel Somers RD over E Fork of Four Mile Crk
GoodPreble County, Ohio · 350 W of ST Rt 732 · Structure no. 6841326
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected April 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 59 ft
- 1 main span
- Daily traffic
- 102
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Israel Somers RD over E Fork of Four Mile Crk is a prestressed concrete box beam or girders - multiple carrying Israel Somers RD over E Fork of Four Mile Crk in Preble County, Ohio. It was built in 2022, so it is 3 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 102 vehicles a day, roughly 5% of them trucks, projected to reach 150 by 2042. The structure is 59 ft (18 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Israel Somers RD over E Fork of Four Mile Crk built?
It was built in 2022, making it 3 years old in 2025.
What condition is Israel Somers RD over E Fork of Four Mile Crk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Israel Somers RD over E Fork of Four Mile Crk carry?
About 102 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is Israel Somers RD over E Fork of Four Mile Crk?
The structure is 59 ft (18 m) long with a longest span of 55 ft (16.8 m) and a deck 28 ft wide.
Who owns Israel Somers RD over E Fork of Four Mile Crk?
It is owned by the County Highway Agency.