US Bridges

SR503 over Bantas Fork

Good

Preble County, Ohio · 1 MI S of W Alexandria · Structure no. 6803660

Built
1956
69 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
159 ft
3 main spans
Daily traffic
2,600
2017 count
Owner
State
State Highway Agency

About this bridge

SR503 over Bantas Fork is a steel continuous stringer/multi-beam or girder carrying SR503 over Bantas Fork in Preble County, Ohio. It was built in 1956, so it is 69 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,600 vehicles a day, roughly 11% of them trucks, projected to reach 2,800 by 2037. The structure is 159 ft (48.5 m) long and 36 ft wide. If it were closed, the detour would be 14.3 mi (23 km).

CarriesSR503
CrossesBantas Fork
Location1 MI S of W Alexandria
RouteState Highway 503
StateOhio
Coordinates39.72516, -84.53545
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.9 US tons
Inventory rating39.2 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length159 ft (48.5 m)
Longest span60 ft (18.3 m)
Deck width36 ft (11 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,600 (2017)
Projected traffic2,800 by 2037
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed14.3 mi (23 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR503 over Bantas Fork built?

It was built in 1956, making it 69 years old in 2025.

What condition is SR503 over Bantas Fork in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does SR503 over Bantas Fork carry?

About 2,600 vehicles per day (2017 count), of which roughly 11% are trucks.

How long is SR503 over Bantas Fork?

The structure is 159 ft (48.5 m) long with a longest span of 60 ft (18.3 m) and a deck 36 ft wide.

Who owns SR503 over Bantas Fork?

It is owned by the State Highway Agency.