US Bridges

Mogadore Road over Plum Creek

Good

Portage County, Ohio · 0.35 Mi. N O FSR261 · Structure no. 6760236

Built
2010
15 years old
Condition
Good
inspected August 2023
Type
Culvert
Concrete
Length
34 ft
1 main span
Daily traffic
5,295
2015 count
Owner
City
City or Municipal Highway Agency

About this bridge

Mogadore Road over Plum Creek is a concrete culvert carrying Mogadore Road over Plum Creek in Portage County, Ohio. It was built in 2010, so it is 15 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,295 vehicles a day, roughly 5% of them trucks, projected to reach 7,349 by 2035. The structure is 34 ft (10.4 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMogadore Road
CrossesPlum Creek
Location0.35 Mi. N O FSR261
RouteCity Street 81
StateOhio
Coordinates41.13972, -81.37167
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating56.1 US tons
Inventory rating33.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length34 ft (10.4 m)
Longest span32 ft (9.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,295 (2015)
Projected traffic7,349 by 2035
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mogadore Road over Plum Creek built?

It was built in 2010, making it 15 years old in 2025.

What condition is Mogadore Road over Plum Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Mogadore Road over Plum Creek carry?

About 5,295 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Mogadore Road over Plum Creek?

The structure is 34 ft (10.4 m) long with a longest span of 32 ft (9.8 m).

Who owns Mogadore Road over Plum Creek?

It is owned by the City or Municipal Highway Agency.