Pioneer Trail over Aurora Br Chagrin River
PoorPortage County, Ohio · 1.3 Mi. W/ Chamberlain RD · Structure no. 6730329
- Built
- 1988
- 37 years old
- Condition
- Poor
- inspected July 2024
- Type
- Culvert
- Steel
- Length
- 24 ft
- 2 main spans
- Daily traffic
- 636
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Pioneer Trail over Aurora Br Chagrin River is a steel culvert carrying Pioneer Trail over Aurora Br Chagrin River in Portage County, Ohio. It was built in 1988, so it is 37 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 636 vehicles a day, roughly 5% of them trucks, projected to reach 883 by 2042. The structure is 24 ft (7.3 m) long. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Culvert | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pioneer Trail over Aurora Br Chagrin River built?
It was built in 1988, making it 37 years old in 2025.
What condition is Pioneer Trail over Aurora Br Chagrin River in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in July 2024.
How much traffic does Pioneer Trail over Aurora Br Chagrin River carry?
About 636 vehicles per day (2015 count), of which roughly 5% are trucks.
How long is Pioneer Trail over Aurora Br Chagrin River?
The structure is 24 ft (7.3 m) long with a longest span of 12 ft (3.7 m).
Who owns Pioneer Trail over Aurora Br Chagrin River?
It is owned by the County Highway Agency.