US Bridges

SR 700 over Eagle Creek

Fair

Portage County, Ohio · 1.19 MI S of SR 82 · Structure no. 6704883

Built
1983
42 years old
Condition
Fair
inspected April 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
56 ft
1 main span
Daily traffic
2,168
2015 count
Owner
State
State Highway Agency

About this bridge

SR 700 over Eagle Creek is a prestressed concrete box beam or girders - multiple carrying SR 700 over Eagle Creek in Portage County, Ohio. It was built in 1983, so it is 42 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,168 vehicles a day, roughly 11% of them trucks, projected to reach 3,009 by 2035. The structure is 56 ft (17.1 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 700
CrossesEagle Creek
Location1.19 MI S of SR 82
RouteState Highway 700
StateOhio
Coordinates41.28199, -81.14461
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating49.3 US tons
Inventory rating38.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length56 ft (17.1 m)
Longest span50 ft (15.2 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,168 (2015)
Projected traffic3,009 by 2035
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 700 over Eagle Creek built?

It was built in 1983, making it 42 years old in 2025.

What condition is SR 700 over Eagle Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does SR 700 over Eagle Creek carry?

About 2,168 vehicles per day (2015 count), of which roughly 11% are trucks.

How long is SR 700 over Eagle Creek?

The structure is 56 ft (17.1 m) long with a longest span of 50 ft (15.2 m) and a deck 28 ft wide.

Who owns SR 700 over Eagle Creek?

It is owned by the State Highway Agency.