US Bridges

C008 over Trib of Baker Fork Creek

Good

Pike County, Ohio · 1000 N of CR 15 · Structure no. 6630821

Built
2024
1 years old
Condition
Good
inspected August 2024
Type
Box Beam or Girders - Multiple
Concrete
Length
56 ft
1 main span
Daily traffic
240
2023 count
Owner
County
County Highway Agency

About this bridge

C008 over Trib of Baker Fork Creek is a concrete box beam or girders - multiple carrying C008 over Trib of Baker Fork Creek in Pike County, Ohio. It was built in 2024, so it is 1 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 240 vehicles a day, roughly 3% of them trucks, projected to reach 290 by 2043. The structure is 56 ft (17.1 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesC008
CrossesTrib of Baker Fork Creek
Location1000 N of CR 15
RouteCounty Highway 8
StateOhio
Coordinates39.14857, -83.33992
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating52.9 US tons
Inventory rating40.7 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length56 ft (17.1 m)
Longest span48 ft (14.6 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic240 (2023)
Projected traffic290 by 2043
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C008 over Trib of Baker Fork Creek built?

It was built in 2024, making it 1 years old in 2025.

What condition is C008 over Trib of Baker Fork Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does C008 over Trib of Baker Fork Creek carry?

About 240 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is C008 over Trib of Baker Fork Creek?

The structure is 56 ft (17.1 m) long with a longest span of 48 ft (14.6 m) and a deck 24 ft wide.

Who owns C008 over Trib of Baker Fork Creek?

It is owned by the County Highway Agency.