US Bridges

SR 124 over Leeth Creek

Good

Pike County, Ohio · .17 MI W. of SR 772 · Structure no. 6601421

Built
1992
33 years old
Condition
Good
inspected June 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
73 ft
1 main span
Daily traffic
3,784
2018 count
Owner
State
State Highway Agency

About this bridge

SR 124 over Leeth Creek is a prestressed concrete box beam or girders - multiple carrying SR 124 over Leeth Creek in Pike County, Ohio. It was built in 1992, so it is 33 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,784 vehicles a day, roughly 10% of them trucks, projected to reach 4,626 by 2038. The structure is 73 ft (22.4 m) long and 32 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesSR 124
CrossesLeeth Creek
Location.17 MI W. of SR 772
RouteState Highway 124
StateOhio
Coordinates39.08748, -83.14164
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length73 ft (22.4 m)
Longest span70 ft (21.3 m)
Deck width32 ft (9.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,784 (2018)
Projected traffic4,626 by 2038
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 124 over Leeth Creek built?

It was built in 1992, making it 33 years old in 2025.

What condition is SR 124 over Leeth Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does SR 124 over Leeth Creek carry?

About 3,784 vehicles per day (2018 count), of which roughly 10% are trucks.

How long is SR 124 over Leeth Creek?

The structure is 73 ft (22.4 m) long with a longest span of 70 ft (21.3 m) and a deck 32 ft wide.

Who owns SR 124 over Leeth Creek?

It is owned by the State Highway Agency.