Hayesville Road over Plum Run
FairPickaway County, Ohio · 0.2 MI West of SR 56 · Structure no. 6531334
- Built
- 1900
- 125 years old, rebuilt 1983
- Condition
- Fair
- inspected December 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 45 ft
- 1 main span
- Daily traffic
- 614
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Hayesville Road over Plum Run is a prestressed concrete box beam or girders - multiple carrying Hayesville Road over Plum Run in Pickaway County, Ohio. It was built in 1900 and reconstructed in 1983, so it is 125 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 614 vehicles a day, roughly 7% of them trucks, projected to reach 852 by 2035. The structure is 45 ft (13.7 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hayesville Road over Plum Run built?
It was built in 1900, making it 125 years old in 2025. It was reconstructed in 1983.
What condition is Hayesville Road over Plum Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Hayesville Road over Plum Run carry?
About 614 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is Hayesville Road over Plum Run?
The structure is 45 ft (13.7 m) long with a longest span of 42 ft (12.8 m) and a deck 24 ft wide.
Who owns Hayesville Road over Plum Run?
It is owned by the County Highway Agency.