US Bridges

County Road 424 over Zuber Cutoff

Good

Paulding County, Ohio · 2 MI East of Antwerp · Structure no. 6330053

Built
1996
29 years old
Condition
Good
inspected December 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
181 ft
3 main spans
Daily traffic
807
2015 count
Owner
County
County Highway Agency

About this bridge

County Road 424 over Zuber Cutoff is a prestressed concrete continuous box beam or girders - multiple carrying County Road 424 over Zuber Cutoff in Paulding County, Ohio. It was built in 1996, so it is 29 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 807 vehicles a day, roughly 6% of them trucks, projected to reach 1,120 by 2035. The structure is 181 ft (55.2 m) long and 44 ft wide. If it were closed, the detour would be 11.2 mi (18 km).

CarriesCounty Road 424
CrossesZuber Cutoff
Location2 MI East of Antwerp
RouteCounty Highway C0424
StateOhio
Coordinates41.2015, -84.69331
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.2 US tons
Inventory rating30.3 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, precast panels
Main spans3
Design loadHS 20 + Mod
Structure length181 ft (55.2 m)
Longest span68 ft (20.7 m)
Deck width44 ft (13.4 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic807 (2015)
Projected traffic1,120 by 2035
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.2 mi (18 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County Road 424 over Zuber Cutoff built?

It was built in 1996, making it 29 years old in 2025.

What condition is County Road 424 over Zuber Cutoff in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does County Road 424 over Zuber Cutoff carry?

About 807 vehicles per day (2015 count), of which roughly 6% are trucks.

How long is County Road 424 over Zuber Cutoff?

The structure is 181 ft (55.2 m) long with a longest span of 68 ft (20.7 m) and a deck 44 ft wide.

Who owns County Road 424 over Zuber Cutoff?

It is owned by the County Highway Agency.