US Bridges

SR 2 over Portage River

Fair

Ottawa County, Ohio · 1/2 Mi. E. SR 163 · Structure no. 6200338

Built
1968
57 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
509 ft
6 main spans
Daily traffic
10,855
2015 count
Owner
State
State Highway Agency

About this bridge

SR 2 over Portage River is a steel continuous stringer/multi-beam or girder carrying SR 2 over Portage River in Ottawa County, Ohio. It was built in 1968, so it is 57 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,855 vehicles a day, roughly 13% of them trucks, projected to reach 13,251 by 2035. The structure is 509 ft (155.1 m) long and 91 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesSR 2
CrossesPortage River
Location1/2 Mi. E. SR 163
RouteState Highway 2
StateOhio
Coordinates41.51274, -82.99151
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating53.6 US tons
Inventory rating42.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans6
Design loadH 20
Structure length509 ft (155.1 m)
Longest span90 ft (27.4 m)
Deck width91 ft (27.8 m)
Roadway width88 ft (26.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,855 (2015)
Projected traffic13,251 by 2035
Trucks13%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNavigation control on waterway (bridge permit required)

Frequently asked questions

When was SR 2 over Portage River built?

It was built in 1968, making it 57 years old in 2025.

What condition is SR 2 over Portage River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does SR 2 over Portage River carry?

About 10,855 vehicles per day (2015 count), of which roughly 13% are trucks.

How long is SR 2 over Portage River?

The structure is 509 ft (155.1 m) long with a longest span of 90 ft (27.4 m) and a deck 91 ft wide.

Who owns SR 2 over Portage River?

It is owned by the State Highway Agency.