US Bridges

SR 2 over Toussaint River

Good

Ottawa County, Ohio · 0.75 MI S. of CR 24 · Structure no. 6200133

Built
2000
25 years old
Condition
Good
inspected August 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
338 ft
6 main spans
Daily traffic
7,992
2018 count
Owner
State
State Highway Agency

About this bridge

SR 2 over Toussaint River is a prestressed concrete box beam or girders - multiple carrying SR 2 over Toussaint River in Ottawa County, Ohio. It was built in 2000, so it is 25 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,992 vehicles a day, roughly 14% of them trucks, projected to reach 8,139 by 2038. The structure is 338 ft (103 m) long and 48 ft wide. If it were closed, the detour would be 23 mi (37 km).

CarriesSR 2
CrossesToussaint River
Location0.75 MI S. of CR 24
RouteState Highway 2
StateOhio
Coordinates41.58549, -83.09563
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.4 US tons
Inventory rating42.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20 + Mod
Structure length338 ft (103 m)
Longest span56 ft (17.1 m)
Deck width48 ft (14.7 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,992 (2018)
Projected traffic8,139 by 2038
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed23 mi (37 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 2 over Toussaint River built?

It was built in 2000, making it 25 years old in 2025.

What condition is SR 2 over Toussaint River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does SR 2 over Toussaint River carry?

About 7,992 vehicles per day (2018 count), of which roughly 14% are trucks.

How long is SR 2 over Toussaint River?

The structure is 338 ft (103 m) long with a longest span of 56 ft (17.1 m) and a deck 48 ft wide.

Who owns SR 2 over Toussaint River?

It is owned by the State Highway Agency.