US Bridges

Adams Lane over Joes Run

Good

Muskingum County, Ohio · 0.41 MI N of SR 146 · Structure no. 6040242

Built
2024
1 years old
Condition
Good
inspected October 2024
Type
Slab
Concrete
Length
37 ft
1 main span
Daily traffic
5,344
2022 count
Owner
County
County Highway Agency

About this bridge

Adams Lane over Joes Run is a concrete slab carrying Adams Lane over Joes Run in Muskingum County, Ohio. It was built in 2024, so it is 1 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,344 vehicles a day, roughly 5% of them trucks, projected to reach 5,878 by 2042. The structure is 37 ft (11.4 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesAdams Lane
CrossesJoes Run
Location0.41 MI N of SR 146
RouteCounty Highway 297
StateOhio
Coordinates39.9636, -82.02524
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating107.1 US tons
Inventory rating89.6 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length37 ft (11.4 m)
Longest span34 ft (10.5 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,344 (2022)
Projected traffic5,878 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Adams Lane over Joes Run built?

It was built in 2024, making it 1 years old in 2025.

What condition is Adams Lane over Joes Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Adams Lane over Joes Run carry?

About 5,344 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Adams Lane over Joes Run?

The structure is 37 ft (11.4 m) long with a longest span of 34 ft (10.5 m) and a deck 28 ft wide.

Who owns Adams Lane over Joes Run?

It is owned by the County Highway Agency.