US Bridges

Cutler Lake Road over Manns Fork Salt Creek

Good

Muskingum County, Ohio · 0.42 Miles S. of Mock RD · Structure no. 6032192

Built
2015
10 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
59 ft
1 main span
Daily traffic
328
2015 count
Owner
County
County Highway Agency

About this bridge

Cutler Lake Road over Manns Fork Salt Creek is a steel stringer/multi-beam or girder carrying Cutler Lake Road over Manns Fork Salt Creek in Muskingum County, Ohio. It was built in 2015, so it is 10 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 328 vehicles a day, roughly 7% of them trucks, projected to reach 455 by 2035. The structure is 59 ft (18.1 m) long and 24 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesCutler Lake Road
CrossesManns Fork Salt Creek
Location0.42 Miles S. of Mock RD
RouteCounty Highway C0045
StateOhio
Coordinates39.85393, -81.8679
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89.3 US tons
Inventory rating67.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length59 ft (18.1 m)
Longest span57 ft (17.4 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic328 (2015)
Projected traffic455 by 2035
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$477 million
NavigationNo navigation control on waterway

Frequently asked questions

When was Cutler Lake Road over Manns Fork Salt Creek built?

It was built in 2015, making it 10 years old in 2025.

What condition is Cutler Lake Road over Manns Fork Salt Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Cutler Lake Road over Manns Fork Salt Creek carry?

About 328 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is Cutler Lake Road over Manns Fork Salt Creek?

The structure is 59 ft (18.1 m) long with a longest span of 57 ft (17.4 m) and a deck 24 ft wide.

Who owns Cutler Lake Road over Manns Fork Salt Creek?

It is owned by the County Highway Agency.