SR 313 over Buffalo Fork of Salt Crk
FairMuskingum County, Ohio · .23 MI N of Jct. SR 146 · Structure no. 6005586
- Built
- 1949
- 76 years old
- Condition
- Fair
- inspected October 2024
- Type
- Slab
- Concrete Continuous
- Length
- 137 ft
- 4 main spans
- Daily traffic
- 248
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 313 over Buffalo Fork of Salt Crk is a concrete continuous slab carrying SR 313 over Buffalo Fork of Salt Crk in Muskingum County, Ohio. It was built in 1949, so it is 76 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 248 vehicles a day, roughly 13% of them trucks, projected to reach 344 by 2035. The structure is 137 ft (41.7 m) long and 30 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 313 over Buffalo Fork of Salt Crk built?
It was built in 1949, making it 76 years old in 2025.
What condition is SR 313 over Buffalo Fork of Salt Crk in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does SR 313 over Buffalo Fork of Salt Crk carry?
About 248 vehicles per day (2015 count), of which roughly 13% are trucks.
How long is SR 313 over Buffalo Fork of Salt Crk?
The structure is 137 ft (41.7 m) long with a longest span of 37 ft (11.4 m) and a deck 30 ft wide.
Who owns SR 313 over Buffalo Fork of Salt Crk?
It is owned by the State Highway Agency.