US Bridges

TR 442 Kopchak RD over T422 Copchak over I70

Good

Muskingum County, Ohio · 1.1 MI W of JCT US 40 · Structure no. 6002552

Built
1968
57 years old, rebuilt 2003
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
284 ft
4 main spans
Daily traffic
1,695
2015 count
Owner
State
State Highway Agency

About this bridge

TR 442 Kopchak RD over T422 Copchak over I70 is a steel continuous stringer/multi-beam or girder carrying TR 442 Kopchak RD over T422 Copchak over I70 in Muskingum County, Ohio. It was built in 1968 and reconstructed in 2003, so it is 57 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,695 vehicles a day, roughly 8% of them trucks, projected to reach 46,259 by 2035. The structure is 284 ft (86.6 m) long and 30 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesTR 442 Kopchak RD
CrossesT422 Copchak over I70
Location1.1 MI W of JCT US 40
RouteCounty Highway 422
StateOhio
Coordinates39.94701, -82.06724
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating34.6 US tons
Inventory rating26.8 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length284 ft (86.6 m)
Longest span83 ft (25.3 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,695 (2015)
Projected traffic46,259 by 2035
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was TR 442 Kopchak RD over T422 Copchak over I70 built?

It was built in 1968, making it 57 years old in 2025. It was reconstructed in 2003.

What condition is TR 442 Kopchak RD over T422 Copchak over I70 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does TR 442 Kopchak RD over T422 Copchak over I70 carry?

About 1,695 vehicles per day (2015 count), of which roughly 8% are trucks.

How long is TR 442 Kopchak RD over T422 Copchak over I70?

The structure is 284 ft (86.6 m) long with a longest span of 83 ft (25.3 m) and a deck 30 ft wide.

Who owns TR 442 Kopchak RD over T422 Copchak over I70?

It is owned by the State Highway Agency.