EB SR 16 over EB SR 16 over TR 118
GoodMuskingum County, Ohio · 2.5 M W of JCT SR 60 · Structure no. 6000347
- Built
- 2001
- 24 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 56 ft
- 1 main span
- Daily traffic
- 3,099
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
EB SR 16 over EB SR 16 over TR 118 is a steel stringer/multi-beam or girder carrying EB SR 16 over EB SR 16 over TR 118 in Muskingum County, Ohio. It was built in 2001, so it is 24 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,099 vehicles a day, roughly 13% of them trucks, projected to reach 4,301 by 2035. The structure is 56 ft (17.1 m) long and 45 ft wide. If it were closed, the detour would be 19.3 mi (31 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was EB SR 16 over EB SR 16 over TR 118 built?
It was built in 2001, making it 24 years old in 2025.
What condition is EB SR 16 over EB SR 16 over TR 118 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does EB SR 16 over EB SR 16 over TR 118 carry?
About 3,099 vehicles per day (2015 count), of which roughly 13% are trucks.
How long is EB SR 16 over EB SR 16 over TR 118?
The structure is 56 ft (17.1 m) long with a longest span of 54 ft (16.5 m) and a deck 45 ft wide.
Who owns EB SR 16 over EB SR 16 over TR 118?
It is owned by the State Highway Agency.