Oliv Gren-Mar-Fu over I-71
GoodMorrow County, Ohio · 2.73 MI N of SR229 · Structure no. 5901170
- Built
- 1960
- 65 years old, rebuilt 2008
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 398 ft
- 4 main spans
- Daily traffic
- 1,317
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Oliv Gren-Mar-Fu over I-71 is a steel continuous stringer/multi-beam or girder carrying Oliv Gren-Mar-Fu over I-71 in Morrow County, Ohio. It was built in 1960 and reconstructed in 2008, so it is 65 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,317 vehicles a day, roughly 8% of them trucks, projected to reach 70,658 by 2035. The structure is 398 ft (121.4 m) long and 30 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Oliv Gren-Mar-Fu over I-71 built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 2008.
What condition is Oliv Gren-Mar-Fu over I-71 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does Oliv Gren-Mar-Fu over I-71 carry?
About 1,317 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is Oliv Gren-Mar-Fu over I-71?
The structure is 398 ft (121.4 m) long with a longest span of 122 ft (37.3 m) and a deck 30 ft wide.
Who owns Oliv Gren-Mar-Fu over I-71?
It is owned by the State Highway Agency.