US Bridges

Airway Gate Culver over Drainage Ditch

Good

Montgomery County, Ohio · At Intersection of Spinni · Structure no. AFOHZHTV20900

Built
2003
22 years old
Condition
Good
inspected October 2024
Type
Culvert
Concrete
Length
28 ft
1 main span
Daily traffic
1
2020 count
Owner
Federal
Air Force

About this bridge

Airway Gate Culver over Drainage Ditch is a concrete culvert carrying Airway Gate Culver over Drainage Ditch in Montgomery County, Ohio. It was built in 2003, so it is 22 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1 vehicles a day, projected to reach 1 by 2040. The structure is 28 ft (8.5 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesAirway Gate Culver
CrossesDrainage Ditch
LocationAt Intersection of Spinni
StateOhio
Coordinates39.77167, -84.10864
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89.9 US tons
Inventory rating54 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length28 ft (8.5 m)
Longest span28 ft (8.5 m)
Deck width40 ft (12.2 m)
Roadway width37 ft (11.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1 (2020)
Projected traffic1 by 2040
Trucks—
Lanes on structure2
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerAir Force
Maintained byAir Force
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Airway Gate Culver over Drainage Ditch built?

It was built in 2003, making it 22 years old in 2025.

What condition is Airway Gate Culver over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Airway Gate Culver over Drainage Ditch carry?

About 1 vehicles per day (2020 count).

How long is Airway Gate Culver over Drainage Ditch?

The structure is 28 ft (8.5 m) long with a longest span of 28 ft (8.5 m) and a deck 40 ft wide.

Who owns Airway Gate Culver over Drainage Ditch?

It is owned by the Air Force.