US Bridges

Woodman Drive over Bikeway

Good

Montgomery County, Ohio · 50 Ft N of SR35 · Structure no. 5770750

Built
1962
63 years old, rebuilt 2024
Condition
Good
inspected June 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
46 ft
1 main span
Daily traffic
25,278
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Woodman Drive over Bikeway is a prestressed concrete box beam or girders - multiple carrying Woodman Drive over Bikeway in Montgomery County, Ohio. It was built in 1962 and reconstructed in 2024, so it is 63 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25,278 vehicles a day, roughly 5% of them trucks, projected to reach 35,086 by 2038. The structure is 46 ft (14 m) long and 88 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesWoodman Drive
CrossesBikeway
Location50 Ft N of SR35
RouteCity Street 74
StateOhio
Coordinates39.74651, -84.12063
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating62.2 US tons
Inventory rating47.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length46 ft (14 m)
Longest span42 ft (12.8 m)
Deck width88 ft (26.8 m)
Roadway width85 ft (25.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,278 (2018)
Projected traffic35,086 by 2038
Trucks5%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Woodman Drive over Bikeway built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2024.

What condition is Woodman Drive over Bikeway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Woodman Drive over Bikeway carry?

About 25,278 vehicles per day (2018 count), of which roughly 5% are trucks.

How long is Woodman Drive over Bikeway?

The structure is 46 ft (14 m) long with a longest span of 42 ft (12.8 m) and a deck 88 ft wide.

Who owns Woodman Drive over Bikeway?

It is owned by the City or Municipal Highway Agency.