US Bridges

N 12th Street over Sherwood Forest Drg Ditc

GoodPosted for load

Montgomery County, Ohio · .1 MI N of Lindsey Ave · Structure no. 5767873

Built
1972
53 years old
Condition
Good
inspected May 2024
Type
Culvert
Steel
Length
23 ft
1 main span
Daily traffic
1,000
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

N 12th Street over Sherwood Forest Drg Ditc is a steel culvert carrying N 12th Street over Sherwood Forest Drg Ditc in Montgomery County, Ohio. It was built in 1972, so it is 53 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 1,000 vehicles a day, roughly 5% of them trucks, projected to reach 1,388 by 2040. The structure is 23 ft (7 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesN 12th Street
CrossesSherwood Forest Drg Ditc
Location.1 MI N of Lindsey Ave
RouteCity Street 2830
StateOhio
Coordinates39.64602, -84.26962
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating15.3 US tons
Inventory rating11.8 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans1
Design loadHS 15
Structure length23 ft (7 m)
Longest span23 ft (7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2020)
Projected traffic1,388 by 2040
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was N 12th Street over Sherwood Forest Drg Ditc built?

It was built in 1972, making it 53 years old in 2025.

What condition is N 12th Street over Sherwood Forest Drg Ditc in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does N 12th Street over Sherwood Forest Drg Ditc carry?

About 1,000 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is N 12th Street over Sherwood Forest Drg Ditc?

The structure is 23 ft (7 m) long with a longest span of 23 ft (7 m).

Who owns N 12th Street over Sherwood Forest Drg Ditc?

It is owned by the City or Municipal Highway Agency.