US Bridges

Nikolai Boulevard over Stream

Good

Montgomery County, Ohio · 430 Ft E of Byers RD · Structure no. 5767000

Built
2017
8 years old
Condition
Good
inspected May 2023
Type
Arch - Deck
Concrete
Length
30 ft
1 main span
Daily traffic
200
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Nikolai Boulevard over Stream is a concrete arch - deck carrying Nikolai Boulevard over Stream in Montgomery County, Ohio. It was built in 2017, so it is 8 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 10% of them trucks, projected to reach 278 by 2038. The structure is 30 ft (9.2 m) long and 92 ft wide.

CarriesNikolai Boulevard
CrossesStream
Location430 Ft E of Byers RD
RouteCity Street 6354
StateOhio
Coordinates39.60125, -84.24542
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.1 US tons
Inventory rating42.9 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length30 ft (9.2 m)
Longest span29 ft (8.8 m)
Deck width92 ft (28 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2018)
Projected traffic278 by 2038
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Nikolai Boulevard over Stream built?

It was built in 2017, making it 8 years old in 2025.

What condition is Nikolai Boulevard over Stream in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Nikolai Boulevard over Stream carry?

About 200 vehicles per day (2018 count), of which roughly 10% are trucks.

How long is Nikolai Boulevard over Stream?

The structure is 30 ft (9.2 m) long with a longest span of 29 ft (8.8 m) and a deck 92 ft wide.

Who owns Nikolai Boulevard over Stream?

It is owned by the City or Municipal Highway Agency.