Findlay Street over Mad River and Bike Path
FairMontgomery County, Ohio · .2 MI S JCT SR 4 · Structure no. 5761115
- Built
- 2006
- 19 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 395 ft
- 3 main spans
- Daily traffic
- 15,043
- 2015 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Findlay Street over Mad River and Bike Path is a prestressed concrete continuous stringer/multi-beam or girder carrying Findlay Street over Mad River and Bike Path in Montgomery County, Ohio. It was built in 2006, so it is 19 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,043 vehicles a day, roughly 4% of them trucks, projected to reach 20,880 by 2035. The structure is 395 ft (120.4 m) long and 66 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Findlay Street over Mad River and Bike Path built?
It was built in 2006, making it 19 years old in 2025.
What condition is Findlay Street over Mad River and Bike Path in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Findlay Street over Mad River and Bike Path carry?
About 15,043 vehicles per day (2015 count), of which roughly 4% are trucks.
How long is Findlay Street over Mad River and Bike Path?
The structure is 395 ft (120.4 m) long with a longest span of 131 ft (39.9 m) and a deck 66 ft wide.
Who owns Findlay Street over Mad River and Bike Path?
It is owned by the City or Municipal Highway Agency.