Clyo Road C0083 over Sugar Creek
GoodMontgomery County, Ohio · 1.4 Miles South of SR725 · Structure no. 5752388
- Built
- 1962
- 63 years old, rebuilt 1989
- Condition
- Good
- inspected November 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 34 ft
- 1 main span
- Daily traffic
- 9,311
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Clyo Road C0083 over Sugar Creek is a prestressed concrete box beam or girders - multiple carrying Clyo Road C0083 over Sugar Creek in Montgomery County, Ohio. It was built in 1962 and reconstructed in 1989, so it is 63 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,311 vehicles a day, roughly 1% of them trucks, projected to reach 12,924 by 2035. The structure is 34 ft (10.4 m) long and 36 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Clyo Road C0083 over Sugar Creek built?
It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1989.
What condition is Clyo Road C0083 over Sugar Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Clyo Road C0083 over Sugar Creek carry?
About 9,311 vehicles per day (2015 count), of which roughly 1% are trucks.
How long is Clyo Road C0083 over Sugar Creek?
The structure is 34 ft (10.4 m) long with a longest span of 30 ft (9.1 m) and a deck 36 ft wide.
Who owns Clyo Road C0083 over Sugar Creek?
It is owned by the County Highway Agency.