Stop Eight RD-T108 over I75 Poe Avenue
PoorClosed to trafficMontgomery County, Ohio · 2.12MI S of JCT IR70 · Structure no. 5708915
- Built
- 1971
- 54 years old, rebuilt 2012
- Condition
- Poor
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 249 ft
- 5 main spans
- Daily traffic
- 2,438
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Stop Eight RD-T108 over I75 Poe Avenue is a steel continuous stringer/multi-beam or girder carrying Stop Eight RD-T108 over I75 Poe Avenue in Montgomery County, Ohio. It was built in 1971 and reconstructed in 2012, so it is 54 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 0 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: closed to all traffic.
It carries about 2,438 vehicles a day, roughly 5% of them trucks, projected to reach 148,703 by 2035. The structure is 249 ft (76 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 0 Failed | Out of service and beyond corrective action. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stop Eight RD-T108 over I75 Poe Avenue built?
It was built in 1971, making it 54 years old in 2025. It was reconstructed in 2012.
What condition is Stop Eight RD-T108 over I75 Poe Avenue in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in September 2024.
How much traffic does Stop Eight RD-T108 over I75 Poe Avenue carry?
About 2,438 vehicles per day (2015 count), of which roughly 5% are trucks.
How long is Stop Eight RD-T108 over I75 Poe Avenue?
The structure is 249 ft (76 m) long with a longest span of 60 ft (18.2 m) and a deck 36 ft wide.
Who owns Stop Eight RD-T108 over I75 Poe Avenue?
It is owned by the State Highway Agency.