SR 4 over Grt Miami R N Bend Blvd
GoodMontgomery County, Ohio · .25 MI N of JCT SR-48 · Structure no. 5708419
- Built
- 2012
- 13 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 823 ft
- 7 main spans
- Daily traffic
- 19,382
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 4 over Grt Miami R N Bend Blvd is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 4 over Grt Miami R N Bend Blvd in Montgomery County, Ohio. It was built in 2012, so it is 13 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 19,382 vehicles a day, roughly 6% of them trucks, projected to reach 26,902 by 2035. The structure is 823 ft (250.8 m) long and 47 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 4 over Grt Miami R N Bend Blvd built?
It was built in 2012, making it 13 years old in 2025.
What condition is SR 4 over Grt Miami R N Bend Blvd in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does SR 4 over Grt Miami R N Bend Blvd carry?
About 19,382 vehicles per day (2015 count), of which roughly 6% are trucks.
How long is SR 4 over Grt Miami R N Bend Blvd?
The structure is 823 ft (250.8 m) long with a longest span of 125 ft (38.1 m) and a deck 47 ft wide.
Who owns SR 4 over Grt Miami R N Bend Blvd?
It is owned by the State Highway Agency.