US Bridges

Ramp EB35 to NB75 over RMP=US35*E-I75*N Un Rmps

Good

Montgomery County, Ohio · .03MI.N. of JCT USR-35 · Structure no. 5707595

Built
1969
56 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
1,068 ft
10 main spans
Daily traffic
122,680
2009 count
Owner
State
State Highway Agency

About this bridge

Ramp EB35 to NB75 over RMP=US35*E-I75*N Un Rmps is a steel continuous stringer/multi-beam or girder carrying Ramp EB35 to NB75 over RMP=US35*E-I75*N Un Rmps in Montgomery County, Ohio. It was built in 1969, so it is 56 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 122,680 vehicles a day, roughly 12% of them trucks, projected to reach 170,280 by 2029. The structure is 1,068 ft (325.5 m) long and 30 ft wide.

CarriesRamp EB35 to NB75
CrossesRMP=US35*E-I75*N Un Rmps
Location.03MI.N. of JCT USR-35
RouteInterstate 75
StateOhio
Coordinates39.74824, -84.2055
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment9: Superior to present desirable criteria
Operating rating40.7 US tons
Inventory rating31.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans10
Design loadHS 20 + Mod
Structure length1,068 ft (325.5 m)
Longest span126 ft (38.4 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deck15 ft (4.7 m)

Traffic and service

Average daily traffic122,680 (2009)
Projected traffic170,280 by 2029
Trucks12%
Lanes on structure1
Traffic directionOne-way traffic
CarriesThird level (interchange)
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp EB35 to NB75 over RMP=US35*E-I75*N Un Rmps built?

It was built in 1969, making it 56 years old in 2025.

What condition is Ramp EB35 to NB75 over RMP=US35*E-I75*N Un Rmps in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Ramp EB35 to NB75 over RMP=US35*E-I75*N Un Rmps carry?

About 122,680 vehicles per day (2009 count), of which roughly 12% are trucks.

How long is Ramp EB35 to NB75 over RMP=US35*E-I75*N Un Rmps?

The structure is 1,068 ft (325.5 m) long with a longest span of 126 ft (38.4 m) and a deck 30 ft wide.

Who owns Ramp EB35 to NB75 over RMP=US35*E-I75*N Un Rmps?

It is owned by the State Highway Agency.