Usr 40 over Gt Miami R(talr Dm Spwy)
FairMontgomery County, Ohio · .99MI.W. of Miami County · Structure no. 5703549
- Built
- 1922
- 103 years old, rebuilt 2004
- Condition
- Fair
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 150 ft
- 3 main spans
- Daily traffic
- 4,858
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Usr 40 over Gt Miami R(talr Dm Spwy) is a prestressed concrete continuous box beam or girders - multiple carrying Usr 40 over Gt Miami R(talr Dm Spwy) in Montgomery County, Ohio. It was built in 1922 and reconstructed in 2004, so it is 103 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,858 vehicles a day, roughly 6% of them trucks, projected to reach 6,743 by 2035. The structure is 150 ft (45.6 m) long and 31 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Usr 40 over Gt Miami R(talr Dm Spwy) built?
It was built in 1922, making it 103 years old in 2025. It was reconstructed in 2004.
What condition is Usr 40 over Gt Miami R(talr Dm Spwy) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Usr 40 over Gt Miami R(talr Dm Spwy) carry?
About 4,858 vehicles per day (2015 count), of which roughly 6% are trucks.
How long is Usr 40 over Gt Miami R(talr Dm Spwy)?
The structure is 150 ft (45.6 m) long with a longest span of 52 ft (15.8 m) and a deck 31 ft wide.
Who owns Usr 40 over Gt Miami R(talr Dm Spwy)?
It is owned by the State Highway Agency.