US Bridges

CR192 E Main ST over Great Miami River

Good

Miami County, Ohio · E Main ST Piqua Garbry RD · Structure no. 5535964

Built
2006
19 years old
Condition
Good
inspected May 2023
Type
Girder and Floorbeam System
Prestressed Concrete
Length
516 ft
5 main spans
Daily traffic
7,985
2015 count
Owner
County
County Highway Agency

About this bridge

CR192 E Main ST over Great Miami River is a prestressed concrete girder and floorbeam system carrying CR192 E Main ST over Great Miami River in Miami County, Ohio. It was built in 2006, so it is 19 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,985 vehicles a day, roughly 7% of them trucks, projected to reach 11,083 by 2038. The structure is 516 ft (157.3 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCR192 E Main ST
CrossesGreat Miami River
LocationE Main ST Piqua Garbry RD
RouteCounty Highway C0192
StateOhio
Coordinates40.14552, -84.23934
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.2 US tons
Inventory rating22.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHL 93
Structure length516 ft (157.3 m)
Longest span117 ft (35.7 m)
Deck width60 ft (18.3 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,985 (2015)
Projected traffic11,083 by 2038
Trucks7%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR192 E Main ST over Great Miami River built?

It was built in 2006, making it 19 years old in 2025.

What condition is CR192 E Main ST over Great Miami River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does CR192 E Main ST over Great Miami River carry?

About 7,985 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is CR192 E Main ST over Great Miami River?

The structure is 516 ft (157.3 m) long with a longest span of 117 ft (35.7 m) and a deck 60 ft wide.

Who owns CR192 E Main ST over Great Miami River?

It is owned by the County Highway Agency.