CR192 E Main ST over Great Miami River
GoodMiami County, Ohio · E Main ST Piqua Garbry RD · Structure no. 5535964
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected May 2023
- Type
- Girder and Floorbeam System
- Prestressed Concrete
- Length
- 516 ft
- 5 main spans
- Daily traffic
- 7,985
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
CR192 E Main ST over Great Miami River is a prestressed concrete girder and floorbeam system carrying CR192 E Main ST over Great Miami River in Miami County, Ohio. It was built in 2006, so it is 19 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,985 vehicles a day, roughly 7% of them trucks, projected to reach 11,083 by 2038. The structure is 516 ft (157.3 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR192 E Main ST over Great Miami River built?
It was built in 2006, making it 19 years old in 2025.
What condition is CR192 E Main ST over Great Miami River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does CR192 E Main ST over Great Miami River carry?
About 7,985 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is CR192 E Main ST over Great Miami River?
The structure is 516 ft (157.3 m) long with a longest span of 117 ft (35.7 m) and a deck 60 ft wide.
Who owns CR192 E Main ST over Great Miami River?
It is owned by the County Highway Agency.