US Bridges

IR-75 over Patrizio Pl (aband Rr)

Good

Miami County, Ohio · .52 Mi. S. of Jct. US36 · Structure no. 5503167

Built
2013
12 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
247 ft
3 main spans
Daily traffic
24,443
2015 count
Owner
State
State Highway Agency

About this bridge

IR-75 over Patrizio Pl (aband Rr) is a prestressed concrete continuous stringer/multi-beam or girder carrying IR-75 over Patrizio Pl (aband Rr) in Miami County, Ohio. It was built in 2013, so it is 12 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 24,443 vehicles a day, roughly 12% of them trucks, projected to reach 33,927 by 2035. The structure is 247 ft (75.3 m) long and 56 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIR-75
CrossesPatrizio Pl (aband Rr)
Location.52 Mi. S. of Jct. US36
RouteInterstate 75
StateOhio
Coordinates40.14359, -84.21842
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.5 US tons
Inventory rating28.2 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length247 ft (75.3 m)
Longest span102 ft (31.1 m)
Deck width56 ft (17.1 m)
Roadway width53 ft (16.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic24,443 (2015)
Projected traffic33,927 by 2035
Trucks12%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IR-75 over Patrizio Pl (aband Rr) built?

It was built in 2013, making it 12 years old in 2025.

What condition is IR-75 over Patrizio Pl (aband Rr) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does IR-75 over Patrizio Pl (aband Rr) carry?

About 24,443 vehicles per day (2015 count), of which roughly 12% are trucks.

How long is IR-75 over Patrizio Pl (aband Rr)?

The structure is 247 ft (75.3 m) long with a longest span of 102 ft (31.1 m) and a deck 56 ft wide.

Who owns IR-75 over Patrizio Pl (aband Rr)?

It is owned by the State Highway Agency.