US Bridges

IR-75 over Branch Great Miami River

Good

Miami County, Ohio · 2.57MI.S. of Jct. USR-36 · Structure no. 5502934

Built
2020
5 years old
Condition
Good
inspected March 2024
Type
Slab
Concrete
Length
57 ft
3 main spans
Daily traffic
49,910
2014 count
Owner
State
State Highway Agency

About this bridge

IR-75 over Branch Great Miami River is a concrete slab carrying IR-75 over Branch Great Miami River in Miami County, Ohio. It was built in 2020, so it is 5 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 49,910 vehicles a day, roughly 36% of them trucks, projected to reach 63,885 by 2034. The structure is 57 ft (17.4 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIR-75
CrossesBranch Great Miami River
Location2.57MI.S. of Jct. USR-36
RouteInterstate 75
StateOhio
Coordinates40.11461, -84.22084
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.4 US tons
Inventory rating53.6 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length57 ft (17.4 m)
Longest span20 ft (6.1 m)
Deck width52 ft (15.7 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic49,910 (2014)
Projected traffic63,885 by 2034
Trucks36%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IR-75 over Branch Great Miami River built?

It was built in 2020, making it 5 years old in 2025.

What condition is IR-75 over Branch Great Miami River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does IR-75 over Branch Great Miami River carry?

About 49,910 vehicles per day (2014 count), of which roughly 36% are trucks.

How long is IR-75 over Branch Great Miami River?

The structure is 57 ft (17.4 m) long with a longest span of 20 ft (6.1 m) and a deck 52 ft wide.

Who owns IR-75 over Branch Great Miami River?

It is owned by the State Highway Agency.