US Bridges

Peters Road over I-75

Good

Miami County, Ohio · 1.5 MI N of CR 25A · Structure no. 5501873

Built
2000
25 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
270 ft
2 main spans
Daily traffic
2,833
2015 count
Owner
State
State Highway Agency

About this bridge

Peters Road over I-75 is a prestressed concrete continuous stringer/multi-beam or girder carrying Peters Road over I-75 in Miami County, Ohio. It was built in 2000, so it is 25 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,833 vehicles a day, roughly 5% of them trucks, projected to reach 92,774 by 2035. The structure is 270 ft (82.4 m) long and 47 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesPeters Road
CrossesI-75
Location1.5 MI N of CR 25A
RouteCounty Highway C0149
StateOhio
Coordinates40.00081, -84.22249
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating75.7 US tons
Inventory rating37.8 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length270 ft (82.4 m)
Longest span132 ft (40.2 m)
Deck width47 ft (14.3 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,833 (2015)
Projected traffic92,774 by 2035
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Peters Road over I-75 built?

It was built in 2000, making it 25 years old in 2025.

What condition is Peters Road over I-75 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Peters Road over I-75 carry?

About 2,833 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Peters Road over I-75?

The structure is 270 ft (82.4 m) long with a longest span of 132 ft (40.2 m) and a deck 47 ft wide.

Who owns Peters Road over I-75?

It is owned by the State Highway Agency.