US Bridges

SR-219 over Toti Creek

Good

Mercer County, Ohio · 1.49MI.E.OF Jct. SR-49 · Structure no. 5403049

Built
1990
35 years old
Condition
Good
inspected July 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
63 ft
1 main span
Daily traffic
938
2015 count
Owner
State
State Highway Agency

About this bridge

SR-219 over Toti Creek is a prestressed concrete box beam or girders - multiple carrying SR-219 over Toti Creek in Mercer County, Ohio. It was built in 1990, so it is 35 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 938 vehicles a day, roughly 9% of them trucks, projected to reach 1,302 by 2035. The structure is 63 ft (19.2 m) long and 36 ft wide. If it were closed, the detour would be 16.8 mi (27 km).

CarriesSR-219
CrossesToti Creek
Location1.49MI.E.OF Jct. SR-49
RouteState Highway 219
StateOhio
Coordinates40.47968, -84.75624
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.2 US tons
Inventory rating46.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length63 ft (19.2 m)
Longest span60 ft (18.3 m)
Deck width36 ft (11 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic938 (2015)
Projected traffic1,302 by 2035
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed16.8 mi (27 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR-219 over Toti Creek built?

It was built in 1990, making it 35 years old in 2025.

What condition is SR-219 over Toti Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does SR-219 over Toti Creek carry?

About 938 vehicles per day (2015 count), of which roughly 9% are trucks.

How long is SR-219 over Toti Creek?

The structure is 63 ft (19.2 m) long with a longest span of 60 ft (18.3 m) and a deck 36 ft wide.

Who owns SR-219 over Toti Creek?

It is owned by the State Highway Agency.