US Bridges

RD 28 - Pawnee RD over Clear Creek

Good

Medina County, Ohio · 23 N of RD 80E · Structure no. 5233683

Built
2024
1 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
42 ft
1 main span
Daily traffic
285
2023 count
Owner
County
County Highway Agency

About this bridge

RD 28 - Pawnee RD over Clear Creek is a prestressed concrete stringer/multi-beam or girder carrying RD 28 - Pawnee RD over Clear Creek in Medina County, Ohio. It was built in 2024, so it is 1 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 285 vehicles a day, roughly 3% of them trucks, projected to reach 305 by 2045. The structure is 42 ft (12.9 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesRD 28 - Pawnee RD
CrossesClear Creek
Location23 N of RD 80E
RouteCounty Highway 28
StateOhio
Coordinates41.0143, -82.07788
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating65 US tons
Inventory rating50 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length42 ft (12.9 m)
Longest span35 ft (10.7 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic285 (2023)
Projected traffic305 by 2045
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was RD 28 - Pawnee RD over Clear Creek built?

It was built in 2024, making it 1 years old in 2025.

What condition is RD 28 - Pawnee RD over Clear Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does RD 28 - Pawnee RD over Clear Creek carry?

About 285 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is RD 28 - Pawnee RD over Clear Creek?

The structure is 42 ft (12.9 m) long with a longest span of 35 ft (10.7 m) and a deck 28 ft wide.

Who owns RD 28 - Pawnee RD over Clear Creek?

It is owned by the County Highway Agency.