Ir 71 Exit Ramp over Ramp C over Plum Creek S
GoodMedina County, Ohio · SB Exit Ramp to SR3 · Structure no. 5203996
- Built
- 1964
- 61 years old, rebuilt 2002
- Condition
- Good
- inspected August 2024
- Type
- Slab
- Concrete Continuous
- Length
- 73 ft
- 3 main spans
- Daily traffic
- 36,030
- 1988 count
- Owner
- State
- State Highway Agency
About this bridge
Ir 71 Exit Ramp over Ramp C over Plum Creek S is a concrete continuous slab carrying Ir 71 Exit Ramp over Ramp C over Plum Creek S in Medina County, Ohio. It was built in 1964 and reconstructed in 2002, so it is 61 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 36,030 vehicles a day, roughly 13% of them trucks, projected to reach 50,010 by 2008. The structure is 73 ft (22.4 m) long and 33 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ir 71 Exit Ramp over Ramp C over Plum Creek S built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 2002.
What condition is Ir 71 Exit Ramp over Ramp C over Plum Creek S in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Ir 71 Exit Ramp over Ramp C over Plum Creek S carry?
About 36,030 vehicles per day (1988 count), of which roughly 13% are trucks.
How long is Ir 71 Exit Ramp over Ramp C over Plum Creek S?
The structure is 73 ft (22.4 m) long with a longest span of 28 ft (8.4 m) and a deck 33 ft wide.
Who owns Ir 71 Exit Ramp over Ramp C over Plum Creek S?
It is owned by the State Highway Agency.