County Road 67 over Br over Bolden Swale
FairMarion County, Ohio · .1 MI E of JCT TR 91 · Structure no. 5131375
- Built
- 1964
- 61 years old, rebuilt 1993
- Condition
- Fair
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 44 ft
- 1 main span
- Daily traffic
- 240
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 67 over Br over Bolden Swale is a prestressed concrete box beam or girders - multiple carrying County Road 67 over Br over Bolden Swale in Marion County, Ohio. It was built in 1964 and reconstructed in 1993, so it is 61 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 240 vehicles a day, roughly 8% of them trucks, projected to reach 756 by 2035. The structure is 44 ft (13.4 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 67 over Br over Bolden Swale built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 1993.
What condition is County Road 67 over Br over Bolden Swale in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does County Road 67 over Br over Bolden Swale carry?
About 240 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is County Road 67 over Br over Bolden Swale?
The structure is 44 ft (13.4 m) long with a longest span of 43 ft (13.1 m) and a deck 28 ft wide.
Who owns County Road 67 over Br over Bolden Swale?
It is owned by the County Highway Agency.